Update 7/23/14:
I talked to James Romeyn yesterday and got a status update on my amp builds. He is still working his way through a surge in Hypex nc400 amp builds and, unfortunately, he has encountered some unexpected problems that he had to rectify (such as fixing an unexpected hum issue on a bridged nc400 build and a lack of predrilled screw holes on some ncore switch mode power supplies).
I requested he take care of these builds first so that he meets his guaranteed turnaround deadlines and so he can devote all his attention to my amp builds without feeling rushed.
However, the downside is that my amps will not be delivered for another 2-3 weeks. I'm okay with this since I'm not currently without a good amplifier.
I apologize for the delay since I am very anxious and curious, just like some followers of this thread may be, to actually discover how these amps perform.
I'll continue to try and update as things progress.
Thanks,
Tim
I talked to James Romeyn yesterday and got a status update on my amp builds. He is still working his way through a surge in Hypex nc400 amp builds and, unfortunately, he has encountered some unexpected problems that he had to rectify (such as fixing an unexpected hum issue on a bridged nc400 build and a lack of predrilled screw holes on some ncore switch mode power supplies).
I requested he take care of these builds first so that he meets his guaranteed turnaround deadlines and so he can devote all his attention to my amp builds without feeling rushed.
However, the downside is that my amps will not be delivered for another 2-3 weeks. I'm okay with this since I'm not currently without a good amplifier.
I apologize for the delay since I am very anxious and curious, just like some followers of this thread may be, to actually discover how these amps perform.
I'll continue to try and update as things progress.
Thanks,
Tim