.
One more note. It is well worth it to buy the wiring and send it off to be double cryoed (www.cryogenicsinternational.com) before installing the wiring. It is a great improvement over non-cryoed wire. Since this is a one shot deal, you should do the cryoing since you will not want to re-do the wiring later.
.
Keep one more thought in mind. The dedicated lines will take time to break in just as would any interconnect, spearker wire or power cord. A neat trick is to get the wire, get it cryoed and then terminate it with a male and female plugs and then run your refrigerator with the wire until you install the wiring (the longer on the refrigerator the better, 3-4 weeks would be great, longer would be better).
.
Rgds,
Larry
.
One more note. It is well worth it to buy the wiring and send it off to be double cryoed (www.cryogenicsinternational.com) before installing the wiring. It is a great improvement over non-cryoed wire. Since this is a one shot deal, you should do the cryoing since you will not want to re-do the wiring later.
.
Keep one more thought in mind. The dedicated lines will take time to break in just as would any interconnect, spearker wire or power cord. A neat trick is to get the wire, get it cryoed and then terminate it with a male and female plugs and then run your refrigerator with the wire until you install the wiring (the longer on the refrigerator the better, 3-4 weeks would be great, longer would be better).
.
Rgds,
Larry
.