Help / Comments - New Construction - Sort of...


Thanks for taking the time to read this if you are... It is a bit bittersweet for me, but the wife and I have put an offer in on a new home and it has been accepted. It is a bit sad after years of hard work into our current home, however situations with her business really dictate we move and build custom.

Now with the sweet of the bittersweet... The "better half" has also allowed me to use the "bonus room" as my dedicated listening room. It measures roughly 15'8" x 21'9" with a ceiling height of 9'. I have made some "minor" requests to the builder at this time. There is to be a "coffered ceiling" which consists of 6" wide by 8" deep beams... square pattern to consist of nine roughly 5'x7' rectangles. I am hoping this will help with diffusion. I have also requested the entire room be hung with double layers of sheetrock. The room is located on the second floor. Also to have 5 dedicated 20 amp lines ran to the room. On the short wall (behind my listening position) is the "chute" for the chimney from the greatroom below. This is approx 18" deep by 3 feet wide. I have made arrangements for cabinets (waist high) and bookshelves to the ceiling (for vinyl) to flank either side of the chimney chute. Only other option at this point was a solid door as well. I am planning on providing the cryo'd romex and duplex' and plan to have the breakers all on the same leg at the top of the box...

All else is yet to be determined. I have a wife that does not want *any* type of "tacky" sonic correction stuff anywhere... the best I have gotten so far is my Eighth Nerve room pack up...

So any suggestions, must do's... let me know. I am not certain I want double drywall, but was told that the stiffer the wall, the better the bass, and livlier the room, as well as help to isolate the sound.

At this point, we just signed the contract this evening, thus all *could be* changed... however budget is about zip, zero, zilch, nada, you get the idea... thus I worked the above into the room with the builder at this point. However, they estimate it will be 6 to 7 months until closing so if there ARE any "MUST DO" suggestions (afraid there will be many...) I do have time to react.

All help is greatly appreciated. My system link has all my gear, minus my TT that is on the way... Nottingham Spacedeck with Ace Space Arm, ZYX Airy3-S-SB with the Whest phono stage...
audiofankj
Tburn's advice is dead on. Cost is small rellatively speaking and reward is high.

As far as the walls and insulation it may be a good idea to type in room dimensions into an in-room frequency response Excell spreadsheet to find the problem frequencies and then read the appropriate chapters in Master Handbook of Accustics to fight the problematic frequencies. It is impossible to build the perfect room but you can build a damn good one.
Here's one place to start. Look through the rest of the site for excellent information on new construction techniques.
http://www.acoustics101.com/walls.asp
Thanks for all the responses thus far. In general would it be key to double up the floor joists under the room, or the 3/4" plywood screwed? Is it imperative for both? I am just asking in case the builder comes back unable to do it for the cost allocated. Should I request that rather than the double layer of drywall, or keep that as well.

The mention of the 2x6 had my thinking the walls were relatively thin on the innerwalls, perhaps 2x4 (if they go that small for inner wall) I am not positive on the house being framed that I walked through. I will have to drive over tomorrow and take a look again.

Is there an order of importance of what is "key" ?

Thanks for all the links too... some reading to do now.
Hi Audiofankj - in response to your question concerning the floor, IMO it would be most beneficial to double the floor joists, especially considering the fact that you use an analog source in your system. Without looking at the framing blueprints nor knowing what length of span is required, I would assume typical construction methods would entail using 2X10 joist lumber (and dependent on local building codes, the builder may be able to get away w/ using 2X8's). This, of course, is quite sufficient to carry normal second floor loads, but will still possess a certain amount of "flex". Again, doubling the joists will greatly strengthen the floor system, and while you're at it, spike the hell out of the doubled pairs (and to really get serious, lay some construction adhesive between the pairs before nailing) You are essentially forming "built-up" beams by doing all this labor. And timed right, you and some buddies could do this on a weekend (the contractor would need to know so as not to apply the decking before you got to it). As an aside, but probably prohibitive if working within a tight budget, is the availability of new types of trussed or plywood I-beam joist systems which could also be considered (you'd need to consult an architect on this subject).

Concerning the plywood, it pretty much depends on what the finished flooring will be, and how they typically do the work in your area. I would want a finished floor no less than one to one and a quarter inch minimum thickness. For example, if you go with a wood floor, this would equal approx. one and one-half inches finished. And, again, using construction adhesive on top of the joists before the subfloor plywood is layed will be of benefit.

Sorry - don't really know what level of experience/knowledge
you have with constuction techniques - kinda hard to know how to discuss here. If interested, just drop an email and we can discuss this ad nauseum. I was "complaining" to another AudiogoNer just recently that most of my forum participation is of the 'asking for help' variety, but this is one area that I can offer some suggestions. Regards ...Tom