23/32" that is the thickness, nominal 3/4". Like a 2X4, if you measure it, it is not really a 2X4. The solid bridging in the sound room would be nice. What it will do, no matter where you are walking it will also transfer the load to the joists on either side of the one the weight is on. Did you notice if the T&G was screwed down. In my city it is. Glued and screwed.
Not sure why you want the first layer of rock mud and taped. If you are not going to use wall damping pads between the two layers of rock just make sure the sheet rocker uses a lot of wall adhesive between the two staggered layers of rock. Again glued and screwed. Not nailed. Bass will pop nails over time. Infact I hope the rockers in your area, screw all the rock in the house, not nail it. Also make sure the electrician knows this room will be double rocked. So he can set his rough-in boxes for the correct depth. By the way, any idea the distance your electrical audio oulets will be from the main electrical panel? Those dedicated circuits...
Not sure why you want the first layer of rock mud and taped. If you are not going to use wall damping pads between the two layers of rock just make sure the sheet rocker uses a lot of wall adhesive between the two staggered layers of rock. Again glued and screwed. Not nailed. Bass will pop nails over time. Infact I hope the rockers in your area, screw all the rock in the house, not nail it. Also make sure the electrician knows this room will be double rocked. So he can set his rough-in boxes for the correct depth. By the way, any idea the distance your electrical audio oulets will be from the main electrical panel? Those dedicated circuits...

