The price will be $225, incl. shipping.
How is Bruce able to makes these Joints, aka the "Gooseneck" for this price? Machine shop rates are $150 an hour.
We ran into much higher estimate costs to do a run of Goosenecks as discussed on this thread a while back. So the aluminum Mounting Base and Joint/Gooseneck are about the same price.
Is the Gooseneck not more of challenge (labor & material wise) to make ?

